Caltrans construction planned next week

archive_import

Caltrans construction planned next week

Drivers could face delays on several regional roads due to road construction planned through Thursday.

Caltrans plans to work on the following projects:

?Del Norte County: U.S. Hwy. 101 from milepost 14.8 to 15.6, Caltrans continues pavement testing from 1 mile north to 1.8 miles north of Rudisill Road between 8 a.m.-5 p.m. weekdays. One-way traffic control is in effect, expect 10-minute delays.

From milepost 43.2 to 46.5, widening of the Gilbert Creek Bridge continues between 7 a.m. and 3:30 p.m. weekdays. One-way traffic control is in effect and motorists should expect 15-minute delays.

?U.S. Hwy. 199 from milepost 25.4 to 28.1, a curve realignment project from Siskiyou Fork Road to Idlewild Maintenance Station Road continues between 7 a.m. and 6 p.m. weekdays. One-way traffic control is in effect and motorists can expect 15-minute delays.

?Humboldt County: Hwy. 101 from milepost 39.8 to 43.0, sink hole repair at about 2 miles north of Redcrest continues with traffic flowing through one lane in each direction 24/7. Expect minor traffic slowdowns.

From milepost 54.6 to 57.7, a project to replace the southbound Van Duzen River Bridge continues between 7 a.m. and 7 p.m. weekdays. Traffic is restricted to one lane in each direction 24/7. Expect minor traffic slowdowns.

Triplicate wire service and staff

13896180
The Del Norte Triplicate
This image is copyrighted.

Crescent City autos, jobs, real estate and merchandise.

Ads appear Online and in Print

View Classifieds

Connect with The Del Norte Triplicate


Triplicate Newsstand

Saturday September 24, 2016

Read digital interactive editions of our publications

Read Today's Edition Take A Tour
View All Publications